NorthCE designed for the removal of the existing air handling system serving the roller grind workshop at the Albury site, from the main building chilled water and steam-based heating water system and provide an independent standalone cooling and heating system to serve this space.
The design included options for gas fired absorption boilers and air-cooled chillers, as well as reverse cycle chillers.
Commenced: 2020
Client: TVH/Visy
Engineering Services Performed: Mechanical and Electrical Engineering
Engineering Performed By: NorthCE